Problem to be Solved: 50-year-old concrete slab with elevated RH readings needing multiple repairs

Unique Characteristics: 50-year-old slab, elevated RH readings, multiple repairs, and pour backs

Solution: Contractor used complete KOSTER Moisture Control System to repair concrete slab, create a vapor barrier, and create a smooth level surface to apply finish flooring.

Installation Details: Existing glue had to be removed from the surface using a grinder. The concrete was then shot blasted to a ICRI CSP 3 profile. KOSTER VAP I® 2000 was then installed and followed by KOSTER VAP I® 06 Primer, KOSTER SC, and KOSTER SL Premium. 

Contractor/Applicator: Commercial Floor Resources  

Застосовані продукти

KÖSTER SL Premium
KÖSTER VAP I 06
KÖSTER VAP I 2000 UFS
Вибрати продукт:

 

 

Back

Top
Austria Brasil Bulgaria China Croatia Denmark Finland Germany Ghana Greece Hungary Italy Japan Kazakhstan Korea Latvia Lebanon Mexico Netherlands Norway Panama Philippines Poland Portugal Romania Russia Senegal Serbia Slovakia Slovenia Thailand Turkey Ukraine United Kingdom United States of America